Every DA Construction project runs on a defined scope and a planned sequence. These case studies show what was built, how long each phase took and what the finished work delivered.
New Construction · Mount Dora, FLGround-up custom residence delivered in 31 weeks on site
New Construction · Mount Dora, FL
A ground-up lakeside residence delivered on a fixed sequence
Full general contracting from site preparation through final walkthrough: foundation, framing, standing seam metal roof, full-height glazing package, mechanical coordination and interior finishes.
Filterable portfolio records live on the projects page, these entries add the scope, schedule and outcome detail behind them.
Kitchens · Mount Dora, FLRelocated range wall, 9 ft waterfall island
Kitchens · Mount Dora, FL
A relocated range wall that made the whole floor plan work
Layout revision with plumbing and electrical relocation, full cabinetry and countertop coordination, tile and finish carpentry, sequenced to keep the household functional through construction.
Additions · Mount Dora, FL480 sq ft added with a matched roofline
Additions · Mount Dora, FL
New square footage that reads as original construction
Foundation and structural tie-in, roofline integration, extension of mechanical and electrical systems, and exterior finish matching against the existing elevation.
Metal BuildingsEngineered slab and anchorage, 14 ft door clearance
Metal Buildings
A slab detailed for drainage before a single panel went up
Site preparation, engineered concrete slab and apron, building erection and anchorage, plus roll-up door and opening installation for equipment access.
Commercial · Sanford, FLTwo stories renovated with zero days of tenant closure
Commercial · Sanford, FL
A commercial renovation sequenced around an occupied building
Interior renovation and exterior improvements to a two-story office building, with trade coordination and owner communication planned around tenant access and business hours.